11
2019
Pavement Repair along French Base School and Air Base and Backfilling Works
الحالة: مكتمل
العميل: Entreprise Ali Zaid
الممول: Entreprise Ali Zaid
تاريخ المنح: November, 2019
تاريخ الانتهاء: February, 2020
Equipment and manpower mobilization and demobilization. Work includes site clearing and traffic management, cutting existing damaged asphalt, excavation, replacement of base course, asphalt milling, base course spot repair, prome coat laying of 5cm asphalt. Demolition and removal of existing concrete slabs, Pipe channels, including pipes, 2 supply and installation of a diameter of 500mm pipe coating, backfilling.