09
2021
Roadworks and infrastructure projects
الحالة: مكتمل
العميل: Djibouti Agency for Social Development (ADDS)
الممول: AFD
تاريخ المنح: September, 2021
تاريخ الانتهاء: March, 2023
The works for Lot 1 (roads) of the firm tranche consist of the construction of approximately 2.00 km of urban roads (roadway and sidewalk), representing 15,250 m² of roadway. The works for Lot 2 (facilities) of the firm tranche consist of the construction of the structural and finishing works based on bioclimatic construction techniques (turnkey buildings and landscaping of outdoor areas).