11
2017
Earthworks of Tranche 1 of the Doraleh desalination plant project in Djibouti
الحالة: مكتمل
العميل: Groupement Tedagua/Eiffage
الممول: Groupement Tedagua/Eiffage
تاريخ المنح: November, 2017
تاريخ الانتهاء: September, 2018
To execute the earthwork and grading works for the Desalination project project including performance of field engineering & Survey and provision of all Manpower, Equipment , Material and other resources. The work shall generally comprise: Earthworks to grade the surface to the required levels. The earth work includes mainly excavation in hard rock and rocky soil. The scope also includes backfilling by borrowing suitable filling material wherever required as per the grading drawing