- Client: YEMGAS (TECHNIP - FRANCE)
- Date récompensée: Mai, 2006
- Date complétée: avril, 2010
détails du projet
Project Scope : Civil Works Construction.
The Construction Subcontract Agreement between HAWK INTERNATIONAL and Yemgas took effect 23rd June 2006.
The scope of work consisted in the execution of all civil works including supply required for the execution of the works for the Process Area of Train 1, Train 2 and South Off-Trains and other areas of the plant such as:
- Site preparation.
- Tank foundations and earth dikes.
- Earth basins.
- Access roads, plant roads and yards.
- Site finishing works.
- Sewer systems (trenches, installation, backfill).
- Underground pressure piping system.
- Civil works related to underground electrical and instrument installations (instrument & electrical duct bunks).
- Concrete works (including foundations, structures, basins, bridges, walls, pits, sleepers, ditches, grouting, etc).
- Fireproofing.
- Fabrication and Installations of steel inserts/ embedded plates.
- Perimeter Fences and Gates.
HAWK INTERNATIONAL constructed a Pre-Cast Concrete Piperack structures. Work included pre-casting and erection of piperack elements such as columns and beams.
- Piperack Length = 2.00 kms (approx).
- Height = varies from 12.00 to 22.00 meters high.
- Nos. of Columns = 500 ea (approx).
- Nos. of Beams = 1000 ea (approx).