Degradation On Taxiway Lima (Dimension 3.00m X12.00m)

Posted by Admin in October, 2019
  1. Client: AIROPORT INTERNATIONAL DE DJIBOUTI
  2. Financier: AIROPORT INTERNATIONAL DE DJIBOUTI
  3. Awarded Date: October, 2019
  4. Completion Date: December, 2019

Project Details

Cutting and disposal from site of existing asphalt pavement. Excavation and removal of existing base layer up to 41cm below existing taxiway. Subgrade improvement with 0/31.5 crushed material if required to reach bottom of base course level. Compaction and asphalt works.