11

2023

Project Title
Infrastructure works for grids 5 and 6 of the Balbala Sud relocation and prevention zone
Project Details

Status: Ongoing

Client: Ministry of Urban Affairs, Planning and Housing; The Urban Rehabilitation and Social Housing Agency (ARULoS)

Financier: ARULoS

Date Awarded: November, 2023

Project Description

Brief description of the work to be carried out by the bidder:


The work essentially comprises the construction of:

• Surface clearing over approximately 34.6 hectares in grid squares 5 and 6;

• Reprofiling of approximately 38 hectares within the sub-grids to ensure surface runoff of rainwater in grid squares 5 and 6;

• Construction of approximately 3.6 km of primary and secondary roads, including earthworks and pavement structure, in grid squares 5 and 6;

• Construction of approximately 13.2 km of HDPE drinking water supply network in grid square 5.