11
2023
Infrastructure works for grids 5 and 6 of the Balbala Sud relocation and prevention zone
Status: Ongoing
Client: Ministry of Urban Affairs, Planning and Housing; The Urban Rehabilitation and Social Housing Agency (ARULoS)
Financier: ARULoS
Date Awarded: November, 2023
Brief description of the work to be carried out by the bidder:
The work essentially comprises the construction of:
• Surface clearing over approximately 34.6 hectares in grid squares 5 and 6;
• Reprofiling of approximately 38 hectares within the sub-grids to ensure surface runoff of rainwater in grid squares 5 and 6;
• Construction of approximately 3.6 km of primary and secondary roads, including earthworks and pavement structure, in grid squares 5 and 6;
• Construction of approximately 13.2 km of HDPE drinking water supply network in grid square 5.